Lingard Private Hospital – Stage 5 Expansion

Services: Construction Management

  • Role:
    Construction Management
  • Pace Project Staff Involved:
    Mark Russell
  • Completion Date:
    Late of 2018

Project Description

Refurbishment/addition of a new two-level building with new operating theatres including Hybrid theatres and a 24 Medical Ward above.

Demolition of one Theatre and refurbish another whilst maintaining a full operational live environment; Refurbishment of CSSD and Part Recovery, New Link Bridge connecting existing medical ward and ICU to new Ward; and Provision of infrastructure.

Project Benefit

Investigate existing facility to incorporate new infrastructure as required and consider long term impacts in terms of new infrastructure and assets being adaptable, flexible and capable of supporting changes in service delivery.

Provide state of the art theatres for complex medical procedures.

Achieve value for money in design engineering and life cycle cost analysis

Key Services

Design/Construction and critical refurbishment works to existing operational hospital